PUBLIC NOTICE

Pursuant to the Wyoming Administrative Procedure Act and the Wyoming Public Service Commission’s (Commission) Procedural Rules, the Commission hereby gives notice of the Application of Rocky Mountain Power (RMP or the Company) for a non-situs Certificate of Public Convenience and Necessity (CPCN) to construct its Boardman-to-Hemingway transmission line as more fully described below:

1. RMP is a division of PacifiCorp, an Oregon corporation, engaged in the business of supplying electric utility service to customers throughout its six-state service territory, including Wyoming. RMP is a public utility, as defined by Wyoming Statute § 37-l-101(a)(vi)(C), subject to the Commission's jurisdiction pursuant to Wyoming Statute § 37-2-112.

2. On February 6, 2023, the Company filed an Application, together with supporting testimony and exhibits, requesting the Commission grant a non-situs CPCN to construct the Boardman-to-Hemingway transmission line (segment H of the Energy Gateway Project) (B2H). The Company included a Petition for Confidential Treatment and Protective Order with its Application.

3. The Company’s proposed Boardman-to-Hemingway is an approximately 300-mile-long, 500-kV transmission line that will extend from a proposed switching station near Boardman, Oregon to the existing Hemingway Substation located in Owyhee County, Idaho. Approximately 274 miles of the transmission line is located in five Oregon counties: Malheur, Baker, Union, Umatilla, and Morrow Counties. A 24-mile segment of the Project will be in Owyhee County in Idaho. The project also consists of a newly constructed switching station near Boardman, Oregon, ten communication stations within the right-of-way of the transmission line, and construction of the Midline Series Capacitor substation.

4. The Company has partnered with Idaho Power Company (IPC) and the Bonneville Power Administration (BPA) to develop the Project. IPC is the overall project manager, responsible for permitting, design, procurement, and construction. IPC will fund and own 45.45 percent and the Company will fund and own 54.55 percent.

5. The Company states the proposed project is necessary for the following reasons: 1) it increases the ability to move resources across and between both of the Company’s balancing authority areas and will allow the Company to export 818 megawatts (MW) of additional generation capacity from Wyoming, Utah, and Idaho generators to Oregon, Washington, and California customers; 2) it enables the Company to avoid higher cost transmission and generation investments to serve the system, including Wyoming, that would be required absent B2H; and 3) it reduces the cost of third-party transmission service included in the net power costs allocated to Wyoming retail customers. The Company states that construction of B2H is expected to produce total-system cost savings of $1.7 billion. The Company states that IPC must begin construction in July 2023 to have the project come into service by 2026.

6. The Company expects its share of the estimated total cost of the project to be between $800 and $900 million, which is estimated to increase Wyoming customer rates by an estimated 1.95 percent once the Company proposes to include the costs of the project in a future general rate case. The Company intends to finance the project through its normal internal and external sources of capital.

7. This is not a complete description of RMP’s Application. You may review the Application at RMP’s Wyoming offices and at the Commission’s office in Cheyenne, Wyoming, during business hours or online at: https://dms.wyo.gov/external/publicusers.aspx (enter Record No. 17236).

8. Anyone desiring to file a statement, intervention petition, protest or request for a public hearing in this matter must do so, in writing, on or before March 15, 2023. Petitions shall set forth the grounds of the proposed intervention or request for hearing as well as the position and the interest of the petitioner in this proceeding. Please mention Docket No. 20000-631-EN-23 in all correspondence with the Commission.

9. If you wish to participate in this matter and you require reasonable accommodation for a disability, please contact the Commission at (307) 777-7427, or write to the Commission at 2515 Warren Avenue, Suite 300, Cheyenne, Wyoming 82002, to make arrangements. Communications impaired persons may also contact the Commission by accessing Wyoming Relay at 711.

PUBLISHED: Feb. 28, March 7, 2023 02282

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF WYOMING

The Wyoming Oil and Gas Conservation Commission (WOGCC) will meet at 9:00 A.M. on Tuesday, March 14, 2023, and WOGCC Examiners will meet beginning Monday, March 13, 2023, and subsequent days between the hours of 8:00 a.m. and 5:00 p.m., to consider the following matters at the office of the State Oil and Gas Supervisor, 2211 King Boulevard, Casper, Wyoming.

DOCKET NO.  /  APPLICANT  /  MATTER  /  S-T-R  /  FORMATION  /  COUNTY

357-2023 / Hilcorp Energy Company / Additional Vertical Wells (Total 8 Dakota) / 32-19-112 / Dakota / Lincoln

Any interested party is entitled to appear and be heard by the Commission at the time and date listed above.  Protests to applications shall be in writing and filed with the State Oil and Gas Supervisor at least three (3) business days prior to the date of hearing pursuant to Wyoming Oil & Gas Conservation Commission Rules & Regulations, Chapter 5, Section 11 and Chapter 5, Section 26.

Pursuant to Chapter 5, Section 12 of the Wyoming Oil & Gas Conservation Commission Rules & Regulations, the written protest must state the grounds of the protest and include information and evidence to demonstrate that: (a) the protestant is a party entitled to notice or relief under Wyo. Stat. Ann. §§ 30-5-101 through 30-5-410; (b) the protestant seeks a remedy that is within the jurisdiction and authority of the Commission. No action shall be taken on an objection or protest that is not timely filed.

DATED this 21st day of February 2023.

Wyoming Oil & Gas Conservation Commission

/s/ Tom Kropatsch, Oil & Gas Supervisor / Commission Secretary

PUBLISHED: Feb. 28, 2023 02281

NOTICE OF APPLICATION FOR TAX DEED

To: George W. Miller & Joe Miller AKA Joseph A. Miller- whose last known address 43 Conroy Street, Diamondville, Wyoming 83116.

With respect to the following lands to wit: 43 Conroy Street Diamondville, Wyoming 83116 (a 1/2 interest in the the West one-half of Lot 3, Block 13, the Original Town of Diamondville, Lincoln County, Wyoming. Also, Lot 4, Block 13, the Original Town of Diamondville, Lincoln County, Wyoming. Also, Lot 5, Block 13, the Original Town of Diamondville, Lincoln County, Wyoming together with all improvements situate thereon and all easements and appurtenances belonging thereto.) DVILLE OT B 13 L 04 05 W2 L 03 10’X75’ EXTENSION T21 R116 S24

You are hereby notified:

That said lands were in the year 2017, and in the name of and in care of George W. Miller & Joe Miller AKA Joseph A. Miller taxed $157.39 as due the County of Lincoln, Wyoming.

That said lands were on July 17, 2018, sold for said tax, plus interest and accruing costs, unto Ricky Maness.

You, George W. Miller &/or Joe Miller AKA Joseph A. Miller, may redeem from the Office of Treasurer in and for the County of Lincoln, State of Wyoming, which said office caused the said lands to be sold as aforesaid, all of said lands at any time prior to the 2nd Day of June, 2023, on which said day the undersigned Ricky C. Maness will apply to said office of Treasurer in and for the County of Lincoln, State of Wyoming, for a tax deed to be issued by said office in the manner and form as prescribed by law.

Dated this 8th day of February, 2023.

/s/ Ricky Maness

Ricky Maness

96 Hedgewood Drive

Lexington, TN 38351

731-968-9689

Published: Feb. 14, 21, 28,  2023 02142

NOTICE OF APPLICATION FOR TAX DEED

To: Lisa Lee Parkinson- whose last known address 412 Emerald Street, Kemmerer, Wyoming 83101.

With respect to the following lands to wit: 412 Emerald Street, Kemmerer, Lincon County, Wyoming 83101 (Lot 7 of Block 3 of the Original Town of Kemmerer, KMER OT B 03 L 07 T21 R116 S14).

You are hereby notified:

That said lands were in the year 2017, and in the name of and in care of Lisa Lee Parkinson taxed $493.09 as due the County of Lincoln, Wyoming.

That said lands were on July 17, 2018, sold for said tax, plus interest and accruing costs, unto Tammy Fessler and transferred to Ricky Maness on June 10, 2020.

You, Lisa Lee Parkinson, may redeem from the Office of Treasurer in and for the County of Lincoln, State of Wyoming, which said office caused the said lands to be sold as aforesaid, all of said lands at any time prior to the 2nd Day of June, 2023, on which said day the undersigned Ricky C. Maness will apply to said office of Treasurer in and for the County of Lincoln, State of Wyoming, for a tax deed to be issued by said office in the manner and form as prescribed by law.

Dated this 8th day of February, 2023.

/s/ Ricky Maness

Ricky Maness

96 Hedgewood Drive

Lexington, TN 38351

731-968-9689

Published: Feb. 14, 21, 28, 2023 02143

SUMMONS FOR PUBLICATION

DISTRICT COURT OF THE THIRD JUDICIAL DISTRICT
LINCOLN COUNTY, STATE OF WYOMING

BARCLAYS MORTGAGE TRUST 2021- )

NPL1, MORTGAGE-BACKED )

SECURITIES, SERIES 2021-NPL1, BY U.S. )

BANK NATIONAL ASSOCIATION, AS )

INDENTURE TRUSTEE, )       Civil No.

Plaintiff, )    2022-CV-157

      v.

UNKNOWN HEIRS AND DEVISEES OF )

ELIZABETH F. REDGRAVE; ELIZABETH )

F. REDGRAVE, deceased; MARK )

REDGRAVE; USAA FEDERAL SAVINGS )
BANK; and all other persons unknown )
claiming or who might claim any right, title, )
estate or interest in or lien or encumbrance )
upon the real and personal property described )
in the complaint for foreclosure adverse to )
plaintiffs ownership or any cloud upon )
plaintiffs title thereto, whether such claim or )
possible claim be present or contingent, )

Defendants. )

THE STATE OF WYOMING TO THE ABOVE-NAMED DEFENDANTS:

Unknown Heirs and Devisees of Elizabeth F. Redgrave;

Elizabeth F. Redgrave, deceased;

and all other persons unknown claiming or who might claim any right, title, estate or interest in or lien or encumbrance upon the real and personal property described in the complaint for foreclosure adverse to plaintiffs ownership or any cloud upon plaintiffs title thereto, whether such claim or possible claim be present or contingent.

YOU ARE HEREBY SUMMONED, pursuant to W.R.C.P. Rule 4, and required to file with the Clerk of District Court of the 3rd Judicial District in and for Lincoln County, Wyoming, located at 925 Sage Avenue, 2nd Floor, P.O. Drawer 510, Kemmerer, WY 83101, and to serve upon the Plaintiffs attorney, an answer to Plaintiffs Complaint for Judicial Foreclosure of the real property located at 247 Solitude Drive, Thayne, WY 83127, which real property is more fully described in the Complaint on file with the court, within twenty (20) days after the service of this Summons upon you, exclusive of the day of service. (If services upon you is made outside the State of Wyoming, you are required to file and serve your answer to the Complaint within thirty (30) days after service of this Summons upon you, exclusive of the date of service.) If you fail to do so, judgment by default

will be taken against you for the relief demanded in said Complaint.

DATED this 6th day of February, 2023.

Kenneth D. Roberts

Clerk of the Court

By Jenny Clarke, Deputy

PUBLISHED: Feb. 21, 28, March 7, 14, 2023 022121